Site Investigation and Construction of the Liverpool Loop and Link Tunnels

机译:利物浦环线与连接隧道的现场勘察与施工

获取原文

摘要

The site investigation and the construction records for the Liverpool Loop and Link underground railway tunnels have been compared to see what lessons of good practice in site investigation emerge. The tunnels were constructed almost entirely within Triassic sandstones generally ranging in strength from weak to moderately strong, enabling roadheaders to be used effectively for most of the excavation. The Report discusses the site investigation and the ground conditions as encountered during construction in some detail. (Copyright (c) Crown Copyright 1978.)