首页> 外文会议>European conference on soil mechanics and geotechnical >Construction impacts of Crossrail Liverpool Street Station on the Royal Mail Tunnel
【24h】

Construction impacts of Crossrail Liverpool Street Station on the Royal Mail Tunnel

机译:Crossrail利物浦街车站对皇家邮件隧道的建设影响

获取原文

摘要

The Crossrail Liverpool Street Station in London has recently been constructed in close proximity to the Royal Mail tunnel. The Crossrail works that have affected the cast iron Royal Mail tunnel include construction of a sprayed concrete lined access shaft within 2m of the tunnel and construction of an 1 lm diameter platform tunnel parallel and within lm beneath the tunnel. Given the very close proximity of the works to the tunnel, this particular interface represented a high risk area of construction. This paper describes how the impact of the Crossrail works on the Royal Mail tunnel was assessed prior to construction. As a result of the impact assessment, mitigation and monitoring measures were proposed. The paper describes the results of the monitoring to assess deformations in the Royal Mail tunnel and provides associated observations of the change of condition of the tunnel.
机译:伦敦的利物浦街(Crossrail Liverpool Street)站最近在皇家邮政隧道(Royal Mail tunnel)附近建造。影响了铸铁皇家邮政隧道的Crossrail工程包括:在隧道2m范围内建造喷涂混凝土衬砌的通道竖井,以及在隧道下方和lm内部平行建造直径为1 lm的平台隧道。考虑到工程非常靠近隧道,这个特殊的界面代表了高风险的施工区域。本文介绍了在施工之前如何评估Crossrail工程对Royal Mail隧道的影响。作为影响评估的结果,提出了缓解和监测措施。该文件描述了评估皇家邮件隧道变形的监测结果,并提供了有关隧道状况变化的相关观察结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号