首页> 外文期刊>Engineering news-record >Concrete Flows in Chicago
【24h】

Concrete Flows in Chicago

机译:芝加哥的混凝土流

获取原文
获取原文并翻译 | 示例
       

摘要

The rebuild of Chicago's historic Wacker Drive-this time, the double-decker road's nearly 60-year-old north-south section-is in full swing. On May 10, Chicago-based contractor James McHugh Construction Co. reached a major milestone on the $300-million project when it poured 1,500 cu yd of concrete over a 10-hour period to complete a section of mainline deck. Composed of 13 in. of reinforced post-tensioned, high-performance concrete with a 2-in. latex overlay, the deck sits on a rebuilt concrete structure that is designed to last 100 years. Local concrete ready-mix supplier Ozinga Bros Inc. set aside 24 trucks for the continuous pour, which required about 170 loads.
机译:芝加哥历史悠久的瓦克路(Wacker Drive)的改建工程(这次是双层路的近60年历史的南北段)正在如火如荼地进行。 5月10日,总部位于芝加哥的承包商James McHugh Construction Co.在这个耗资3亿美元的项目中达到了一个重要的里程碑,该项目在10个小时内浇筑了1,500 cud的混凝土,以完成一部分干线桥面。由13英寸的增强型后张高性能混凝土和2英寸组成。乳胶覆盖层,甲板位于经过重建的混凝土结构上,该结构可使用100年。当地混凝土预拌料供应商Ozinga Bros Inc.预留了24辆卡车进行连续浇筑,需要约170载物。

著录项

  • 来源
    《Engineering news-record》 |2011年第15期|p.7|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:14:25

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号