Comparative analysis of United States and French nuclear power plant siting and construction regulatory policies and their economic consequences

机译:美国和法国核电厂选址和建设监管政策的比较分析及其经济后果

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Despite the substantial commitments of time and money which are devoted to the nuclear power plant siting process, the effectiveness of the system in providing a balanced evaluation of the technical, environmental and public interest considerations is periodically questioned. Until now, all improvements in the siting process have introduced increased complexity and delays. In order to approach this problem from a new point of view, it is interesting to evaluate U.S. siting and licensing processes in contrast with corresponding foreign policies. This work compares the American and French policies. Initially, the economic structures, procedures and regulations in both countries that determine the siting policies and procedures for nuclear power plants are examined. Then, the results of a survey of American utilities' practices concerning their licensing histories and delays that have affected U.S. nuclear power reactors since 1965 are analyzed. It is found that although the French experience is more limited than the American one, French practices emphasize an attempt to shift consideration of major design issues in the early stages of the construction permit process, before major on-site construction commitments are made. Other important differences are that the French process is cooperative and flexible while the American process is adverserial, legalistic and rigid; and the French process allows for very little public participation or review of regulatory decisions while the American process allows relatively easy participation of public and non-federal agencies in the licensing process and has the possibility for review of regulatory decisions at several administrative and judicial levels. Power station construction and operation delays are common in the United States experience and rare in the French experience.
机译:尽管花费了大量的时间和金钱用于核电站的选址过程,但仍会定期质疑该系统在对技术,环境和公共利益方面进行平衡评估的有效性。到目前为止,选址过程中的所有改进都增加了复杂性和延迟。为了从新的角度解决这个问题,与相应的外交政策相比,评估美国的选址和许可程序很有趣。这项工作比较了美国和法国的政策。最初,对两国中确定核电厂选址政策和程序的经济结构,程序和法规进行检查。然后,分析了美国公用事业公司有关其许可历史和自1965年以来影响美国核电反应堆的延误的实践调查结果。研究发现,尽管法国的经验比美国的经验更为有限,但法国的实践强调了在做出重大现场施工承诺之前,试图在施工许可过程的早期阶段转移对主要设计问题的考虑的尝试。其他重要区别是,法国进程是合作和灵活的,而美国进程是不利的,合法的和僵化的;法国程序允许很少的公众参与或监管决定的审查,而美国程序允许公共和非联邦机构相对容易地参与许可程序,并有可能在多个行政和司法级别审查监管决定。在美国,发电厂的建设和运行延误很常见,而在法国,这种情况很少发生。