首页> 美国政府科技报告 >PREPP O and VE (Process Experiment Pilot Plant Opening and Vertification Enclosure) Remote Handling System
【24h】

PREPP O and VE (Process Experiment Pilot Plant Opening and Vertification Enclosure) Remote Handling System

机译:pREpp O和VE(过程实验试验工厂开放和垂直外壳)远程处理系统

获取原文

摘要

The Process Experiment Pilot Plant (PREPP) at the Idaho National Engineering Laboratory (INEL) is designed for volume reduction and packaging of radioactive Transuranic (TRU) waste. The PREPP Opening and Vertification Enclosure (O and VE) Remote Handling System, within that facility is designed to provide examination of the contents of various TRU waste storage containers. This system consists of a TeleRobot, container rotator, examination table, wall mounted grapples, spray and vacuum decontamination system, and access ports. This remotely operated system will; open or remove the lids of the TRU waste containers; extract, examine, and sample their contents; transport unprocessible waste to a separate container; transport processible waste to a volume reduction shredder; and decontaminate the enclosure. The TeleRobot will be the enclosure's primary remote tool incorporating both ''man-in-the-loop'' and programmable capabilities. A basic description of the equipment and operating capabilities of this system are presented. 2 figs. (ERA citation 11:019216)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号