首页> 外文期刊>Rail Engineering International >Data management - enabling a timely, effective and cost-efficient decision making by track machine and railway infrastructure operators
【24h】

Data management - enabling a timely, effective and cost-efficient decision making by track machine and railway infrastructure operators

机译:数据管理 - 通过跟踪机器和铁路基础设施运营商来实现及时,有效和经济的决策决策

获取原文
获取原文并翻译 | 示例
           

摘要

The experts at Plasser & Theurer Connected GmbH, a subsidiary of Plasser & Theurer, who come from various backgrounds, such as software engineering, physics, mathematics and statistics, engage in the collection, networking, integration and evaluation of track construction and maintenance machine data, with the aim to obtain concrete maintenance guidelines, in order to reduce track and machine maintenance costs. Should an unexpected problem occur, the information can assist in finding the best possible solution that is tailored to the needs of the client - having the right data available at the right time can assist both track machine and railway infrastructure operators to make timely, effective and cost-efficient decisions.
机译:Plasser&Thurer Connected GmbH的专家,露天和理发师的子公司来自各种背景,如软件工程,物理,数学和统计,从事轨道建设和维护机数据的收集,网络,集成和评估 ,旨在获得具体的维护指南,以降低轨道和机器维护成本。 如果发生意外问题,信息可以帮助找到满足客户需求的最佳解决方案 - 在正确的时间可用的正确数据可以帮助轨道机器和铁路基础设施运营商及时,有效和 经济高效的决策。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号