Fuzzy Rules for Joint Integration of Production Schedule and Maintenance Planning

机译:生产计划和维护计划联合集成的模糊规则

获取原文
获取原文并翻译 | 示例

摘要

The relationship between production and maintenance has always been considered as a conflict in management decision. Most studies dealing with this problem adopt the approach commonly called "scheduling with availability constraints" [1] [2], where a fixed number of preventive maintenance (PM) activities are planned first then the scheduling of production jobs is optimized considering the PM actions as constraints. Recently, integrated models have been proposed to deal with the two activities simultaneously [3] [4] [5]. Multi objective techniques have been developed to find trade-off solutions to the problem. However, one of the important issues which can influence the quality and efficiency of the obtained solutions is the insertion strategy of production jobs and PM activities to avoid conflicts and gain efficiency. In this paper, we study four types of priority rules to optimize both criteria of production and maintenance simultaneously in parallel machine shop. Rules based on fuzzy logic are proposed and compared to other crisp strategies. Computational results based on a multi objective genetic algorithm show that scheduling rules based on fuzzy logic are effective.
机译:生产和维护之间的关系一直被视为管理决策中的冲突。大多数处理此问题的研究都采用通常称为“有可用性约束的计划”的方法[1] [2],其中首先计划固定数量的预防性维护(PM)活动,然后考虑PM行动来优化生产作业的计划作为约束。最近,已经提出了集成模型来同时处理两个活动[3] [4] [5]。已经开发出多目标技术来找到该问题的折衷解决方案。但是,可能影响所获得解决方案的质量和效率的重要问题之一是生产作业和PM活动的插入策略,以避免冲突并提高效率。在本文中,我们研究了四种优先级规则,以同时优化并行机修车间的生产和维护标准。提出了基于模糊逻辑的规则,并将其与其他清晰策略进行了比较。基于多目标遗传算法的计算结果表明,基于模糊逻辑的调度规则是有效的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号