首页> 中文期刊>铁道建筑技术 >地铁车站盖挖逆作施工中柱桩力学规律研究

地铁车站盖挖逆作施工中柱桩力学规律研究

     

摘要

Temporary vertical support system of Fumin Station Project of Shenzhen Metro Line No.7 is made up of the mid-dle pillar pile,it plays a crucial role for the own stability of foundation pit and compatible deformation of the upper struc-ture.Taking foundation pit project of Fumin Station construction with cut and cover reverse method as an example,three-dimensional finite element models are built based on ABAQUS software to simulate the construction process of dynamic sim-ulation.Through comparatively analyzes the results of numerical calculation and real-time monitoring data,it explores the space-time change law of the middle pillar pile’s axial force in the construction with cut and cover reverse method.It can provide a reference basis for similar projects.%深圳地铁7号线福民站工程临时竖向支撑系统由中柱桩构成,其对于基坑自身的稳定,以及上部结构的协调变形起着至关重要的作用。以福民站基坑工程盖挖逆作施工为例,建立三维有限元模型,基于 ABAQUS 软件对施工过程进行动态仿真模拟,对比分析数值计算结果及实时监测数据,揭示了盖挖逆作施工过程中柱桩轴力时空变化规律,为同类工程提供参考依据。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号