Analysis on the Response of Ground Surface Settlement for a Metro Station during Construction Using the Pile-Beam-Arch (PBA) Method Subjected to Pore Pressure

机译:孔压作用下桩-拱-桩法分析地铁车站施工期地表沉降响应

获取原文

摘要

A simple approach to predict the settlement of ground surface during the construction of metro tunneling using pile-beam-arch (PBA) method, subjected to pore pressure is presented. As to the analysis on the response of a single pile installed beneath the tunnel, a softening nonlinear model was adopted to predict the relationship between unit skin friction and pile-soil relative displacement developed along the pile-soil interface and a bilinear base load-displacement model was used to predict the relationship developed at the pile end. To analyze the settlement of ground surface during the construction of metro tunneling using PBA method, a highly effective iterative computer program was developed. In order to demonstrate the effectiveness and accuracy of the proposed simple method in this paper, the result is compared with one well-instrumented previous test. The proposed simple analytical approach is economical and efficient, and suitable for the analysis of the settlement of ground surface during the construction of metro tunneling using pile-beam-arch (PBA) method subjected to pore pressure.
机译:提出了一种简单的方法来预测地铁隧道施工过程中地基沉降的问题,该方法采用的是桩-拱-拱(PBA)方法,并受到孔隙压力的影响。对于安装在隧道下方的单桩的响应分析,采用软化非线性模型来预测沿桩-土界面发展的单位表皮摩擦力与桩-土相对位移与双线性基础荷载-位移之间的关系。模型用于预测桩端形成的关系。为了分析PBA法在地铁隧道施工过程中地表沉降,开发了一种高效的迭代计算机程序。为了证明本文提出的简单方法的有效性和准确性,将结果与一项经过很好测试的先前测试进行了比较。所提出的简单分析方法既经济又有效,适用于在承受孔隙压力的情况下使用桩-梁-拱(PBA)方法进行地铁隧道施工中地表沉降的分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号