首页> 外国专利> Crushed stone pile construction method, crushed stone pile construction jig, and crushed stone pile construction system

Crushed stone pile construction method, crushed stone pile construction jig, and crushed stone pile construction system

机译:碎石桩的施工方法,碎石桩的施工夹具及碎石桩的施工系统

摘要

PROBLEM TO BE SOLVED: To provide a construction method of a crushed stone pile for preventing the inflow of sediment to the inside of a casing pipe, and capable of surely opening the tip of the casing pipe.SOLUTION: A construction method of a crushed stone pile comprises a first process of penetrating a casing pipe 2 for providing a diametrical expansion part 5 on the tip into the ground in a state of separably storing a cover member 10 in the diametrical expansion part 5, a second process of pulling back the casing pipe 2 from underground and separating the cover member 10 from the diametrical expansion part 5, a third process of inputting a crushed stone G into the casing pipe 2 from aboveground and a fourth process of push-hardening the crushed stone G in the ground by repeating intrusion and pull-back of the casing pipe 2.SELECTED DRAWING: Figure 2
机译:解决的问题:提供一种碎石桩的施工方法,以防止沉淀物流入套管内部,并且能够确定地打开套管的尖端。解决方案:碎石的施工方法桩包括第一过程,即在将覆盖构件10可分离地存储在直径扩展部分5中的状态下,穿入用于在尖端上提供直径扩展部分5的套管2的第二过程,该第二过程是向后拉套管如图2所示,第三步骤是将碎石G从地下输入并从直径扩展部分5分离,第三步骤是将碎石G从地面输入到套管2中,第四步骤是通过重复侵入而将碎石G在地下推动硬化。并拉回套管2.选择的图纸:图2

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号