首页> 外文会议>Rock stress and earthquakes. >Analysis of rock burst and crustal stress measurement in a hydropower’s traffic tunnel at ganzi prefecture, Sichuan Province
【24h】

Analysis of rock burst and crustal stress measurement in a hydropower’s traffic tunnel at ganzi prefecture, Sichuan Province

机译:四川甘孜州水电站行车隧道的岩爆和地壳应力测量分析

获取原文

摘要

There was a hydropower in the transition zone between Qinghai-Tibet plateau and Sichuan Basin, while excavating the traffic tunnel towards its underground structure at about 631 m horizontal depth, many rock burst happened at right arch, and the hydraulic fracturing three dimensional stress measurement was adopt at the place immediately. The paper introduced the process and the result of this measurement, analyzed the spatial distribution of crustal stress and the maximum tangential stress σθ max in tunnel excavation. It found that the direct mechanical cause of the rock burst was that the σθ max at the site of right arch reached 39 MPa, which have greatly exceeded the rock burst critical stress σ lcr 29 MPa.
机译:青藏高原与四川盆地的过渡带有水电,在水平深度约631 m处朝地下结构开挖交通隧道,右拱发生大量岩爆,水力压裂三维应力测量为立即在该地方采用。介绍了该测量的过程和结果,分析了隧道开挖中地壳应力的空间分布和最大切向应力σθmax。研究发现,岩石破裂的直接机械原因是右拱部位的σθmax达到39 MPa,大大超过了岩石破裂的临界应力σlcr 29 MPa。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号