首页> 外文会议>International Conference on Advances Science and Contemporary Engineering >Modeling of Sedimentation Pattern in Bukit Merah Reservoir, Perak, Malaysia
【24h】

Modeling of Sedimentation Pattern in Bukit Merah Reservoir, Perak, Malaysia

机译:植物园泥沙,霹雳州,马来西亚沉积图案建模

获取原文

摘要

Numerical modeling assessment were conducted in order to determine the sedimentation and hence able to predict the sedimentation pattern in Bukit Merah Reservoir, Perak, Malaysia. Bukit Merah is one of the oldest reservoirs in Malaysia constructed in 1902. Simulation of flow distribution and sediment transport were made in CCHE2D mathematical model for quantitative assessment. This research only simulates of up to 7 years due to time limitation. The velocity distribution shows significant impact to sediment distribution and accumulation. The accumulation observed at the upstream and downstream is likely resulted from the bank and local erosion in the reservoir. Through the predicted model, the sediment on the eastern side of the upstream had risen high enough to form a delta. The delta is rapidly accumulating the coarsest fraction of the sediment while finer sediment distributed entirely into the reservoir.
机译:进行了数值建模评估,以确定沉降,从而能够预测Bukit Merah储层,霹雳州马来西亚的沉降模式。 Bukit Merah是1902年建造的马来西亚最古老的水库之一。在CCHE2D数学模型中进行了流量分布和沉积物的模拟,用于定量评估。这项研究只有在时间限制时模拟多达7年。速度分布对沉积物分布和积累显示出显着影响。在上游和下游观察到的积累可能是由于储层中的银行和局部侵蚀所产生的。通过预测模型,上游东侧的沉积物已经上升到足够高,以形成三角洲。三角洲正在迅速积累沉积物的粗糙分数,而完全分布在储层中的更精细的沉积物。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号