首页> 外文会议>2003 ASME(American Society of Mechanical Engineers) Turbo Expo; Jun 16-19, 2003; Atlanta, Georgia >COMPARISON OF VARIOUS TUBE TO HEADER ATTACHMENT DETAILS UNDER CYCLE SERVICE
【24h】

COMPARISON OF VARIOUS TUBE TO HEADER ATTACHMENT DETAILS UNDER CYCLE SERVICE

机译:循环服务下各种管子与页眉连接细节的比较

获取原文
获取原文并翻译 | 示例

摘要

Heat recovery steam generator (HRSG) superheater outlet headers are exposed to cyclic stresses under varying transient operating conditions. Three different tube to header connections are analyzed. Cold, warm, and hot startup cycles are defined along with a load change cycle. These cycles are used to develop boundary conditions for a transient three dimensional finite element analysis of each detail. The results show that the highest stresses are away from the tube to header weld area. For the startup cycles analyzed, equations are presented for cycle life determination.
机译:热量回收蒸汽发生器(HRSG)过热器出口集管在变化的瞬态运行条件下承受循环应力。分析了三种不同的管与集管连接。定义了冷,热和热启动周期以及负载变化周期。这些循环用于为每个细节的瞬态三维有限元分析开发边界条件。结果表明,从管到集管焊接区域的应力最大。对于所分析的启动循环,给出了确定循环寿命的公式。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号