首页>
外国专利>
METHOD FOR MANAGING COUNTERMEASURES FOR A.D.2000
METHOD FOR MANAGING COUNTERMEASURES FOR A.D.2000
展开▼
机译:2000年对策的管理方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To enable a user to easily recognize that countermeasures have been taken for a computer abnormality processing problem related to the date and time in A.D.2000. SOLUTION: A time management stage #311 and a display stage #2 are provided. In the stage #311, the date or the time is displayed or printed; and in the stage #2, information indicating that countermeasures against the computer abnormality processing problem related to the date and time in A.D.2000 have been taken in a program is outputted to a display device so that the user can easily recognize it at the time of mounting this program that the program will be normally operated even in and after A.D.2000.
展开▼