首页> 外国专利> PROCESS FOR OPENING FIELDS FROM HILL BASE BY OPEN WORKINGS

PROCESS FOR OPENING FIELDS FROM HILL BASE BY OPEN WORKINGS

机译:通过公开工作从小山基地中打开字段的过程

摘要

The invention relates to a process for opening a field at the hill base by open working, used for open pit-mining a lignite field. According to the invention, the process for opening the fields at the hill base by open working, consists in that, by reaching a hill versant, at the pit base, there is carried out a route (c), made as a high-capacity excavator (1) advances, this route (c) being arranged in the lateral side of the pit, on level curves and inclined planes. Upon reaching some previously established levels of mining stages, the same excavator (1) carries out some circulating platforms (11) until there is performed a final platform (12), which is at the highest stage of the hill, afterwards there is excavated the last block of the hill (13) and, successively, each lower stage of sterile (9, 8, 7 and 6) by the successive descending of the excavator (1) on the circulating platforms (11) carried out upon climbing, until the volumes thereof are exhausted, afterwards there being performed the outcroppig of the lignite layers (a and b) by the open mining processes, known per se.
机译:本发明涉及一种用于露天开采褐煤田的通过露天作业在山底开辟田地的方法。根据本发明,通过露天作业在山丘基部上开辟田地的方法在于,通过到达坑谷基部上的山丘,执行路线(c),该路线(c)被设计为大容量。挖掘机(1)前进,该路线(c)布置在矿坑的侧面,水平曲线和倾斜平面上。在达到先前确定的采矿阶段水平后,同一台挖掘机(1)进行一些循环平台(11),直到完成了最终平台(12),该平台位于山的最高阶段,之后再进行挖掘。挖掘机(1)在循环平台(11)上的连续下降,继而使山体(13)的最后一个街区(13)以及每个较低的无菌阶段(9、8、7和6)依次上升,直到排空其体积,然后通过本身已知的露天开采工艺进行褐煤层(a和b)的露头。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号