首页> 外国专利> Under Water Dry Structure Construction Method and Functional Working Ship

Under Water Dry Structure Construction Method and Functional Working Ship

机译:水下干式结构施工方法及功能性作业船

摘要

The present invention provides a functional working line to install the caisson in water at elevated a state at a predetermined height above the surface of the water caisson installation and safe operation, and underwater structures dry construction method and start the functional operations and the operations of the line side of the line leaving open easily from the structure around. ; For this purpose, the present invention is circular, depending on the square aperture in the center thereof and forming a caisson, a first yuapjaek and file support for supporting a side of the support file, a second step of moving yuapjaek this line installed in workplace for elevating a file supported on the upper surface and, a step of fixing a support file to operate in the second yuapjaek tosacheung (rock layers), the action line along the fixed supporting files to the steps of operation of the second yuapjaek elevated by a predetermined height from the surface of the water, working from the upper surface of the line Assemble the caisson and a caisson by chimseol the caisson hole comprising the steps of: supporting a first yuapjaek, a construction of structures such as piers inside the caisson, and then lift the caisson after a second yuapjaek and separating, working a second yuapjaek and lowering the working line from the supporting files to the sleep stage was, after tosacheung (rock formations) that supports the file and remove the securing step of injury to the operation of the second line yuapjaek work combines parts of the hinge portion was then separated into left and right heart structures from step to leave the work done by the line. ; This invention can be chimseol the caisson work without separate lines by chimseol the caisson work directly on line, schedule the work line from the water height rise by up to blue ( ), can do the job, regardless of wind direction, etc., working lines are separated / combined which will have the effect of facilitating escape from the structure.
机译:本发明提供了一种功能性工作线,用于将沉箱以升高的状态在水中安装到沉箱表面之上的预定高度处并安全操作,水下结构干法施工并开始其功能运行和操作。线的一侧很容易从结构周围打开。 ;为此,本发明是圆形的,取决于其中心的方形孔口并形成沉箱,第一yuapjaek和用于支撑支撑锉刀侧面的锉刀支撑件,第二步是将yuapjaek移动至安装在工作场所中的这条线用于升高支撑在上表面上的锉刀,以及固定支撑锉刀以在第二yuapjaek tosacheung(岩层)中操作的步骤,沿着固定的支撑锉刀的动作线到第二yuapjaek的操作步骤中被抬高从线的上表面到水面的预定高度。通过chimseol的沉箱孔装配沉箱和沉箱,包括以下步骤:支撑第一yuapjaek,沉箱内部诸如墩的结构的构造,以及然后在第二次yuapjaek分离后抬起沉箱,分离第二次yuapjaek,然后将工作线从支撑锉降低到睡眠阶段, (岩石地层)支撑锉刀,并消除对第二条线操作造成伤害的固定步骤yuapjaek工作结合起来,然后将部分铰链部分从台阶分离成左右心脏结构,以留下由线完成的工作。 ;本发明可以使chimseol沉箱工作没有单独的线,而通过chimseol沉箱工作直接在线,将工作线从水位升高到蓝色()排定,无论风向如何,都可以完成这项工作线被分开/组合在一起,将具有促进从结构逃生的作用。

著录项

  • 公开/公告号KR100617950B1

    专利类型

  • 公开/公告日2006-08-29

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR20040097038

  • 发明设计人 배석동;

    申请日2004-11-24

  • 分类号E02D23;B63B35;

  • 国家 KR

  • 入库时间 2022-08-21 21:23:07

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号