Common contractual issues faced by Malaysian contractors operating in Middle East using FIDIC form of contracts

机译:使用FIDIC合同形式在中东开展业务的马来西亚承包商面临的常见合同问题

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Construction projects are called international when parties from different countries enter into an agreement to carry out the work. Usually, parties use FIDIC standard forms of contracts, as they are widely used globally for complex international projects. During construction, generally, issues occur between parties of the contract when a party contends that, although, the words of the contract, taken literally, seems to apply to the events or the circumstances encountered but within the contemplation of the other party, these events and circumstances seems to be applied differently according to the wording of the same contract and/or the provisions of the governing law of the contract. That would misdirect the parties as to what should happen, who should do what, and often who should bear the cost. Therefore, this study has been taken to identify and categorize the issues of the international construction contract i.e. FIDIC, and, also, to determine the effect of the factors (legal system, language, and application of FIDIC) that are causing the issues, from the experience and the point of view of the Malaysian contractors who worked in the Middle East, specifically, Saudi Arabia and United Arab Emirates. and point out the key issues for the unwary to consider. The methodology of the study includes extensive research and a survey, designed accordingly, with participation of Malaysian professionals who have a vast knowledge and direct involvement in construction project in UAE and Saudi Arabia. The result of this study identified and categorized the issues; focused on key issues; and determined the effects of the factors (the legal system/governing law, language, and application of FIDIC) and how influential each factor is on those issues.
机译:当来自不同国家的当事方达成协议进行这项工作时,建设项目被称为国际项目。通常,当事方使用FIDIC标准合同形式,因为它们在全球广泛用于复杂的国际项目。通常,在构建过程中,当合同一方之间争执时,一方当事人争辩说,尽管从字面上看,合同中的措辞似乎适用于所遇到的事件或情况,但在另一方的考虑下,这些事件却发生在合同双方之间。并且根据同一合同的措词和/或合同适用法律的规定,情况似乎有所不同。这将使当事方在应该发生的事情,应该由谁做的事情以及通常由谁来承担费用的问题上有误导。因此,本研究旨在对国际建筑合同(即FIDIC)的问题进行识别和分类,并确定导致该问题的因素(法律制度,语言和FIDIC的应用)的影响。在中东工作的马来西亚承包商的经验和观点,特别是沙特阿拉伯和阿拉伯联合酋长国。并指出了需要谨慎考虑的关键问题。该研究的方法包括广泛的研究和相应地进行的调查,由具有广泛知识并直接参与阿联酋和沙特阿拉伯建筑项目的马来西亚专业人士参与。这项研究的结果确定了问题并进行了分类;专注于关键问题;并确定了这些因素(法律体系/管辖法律,语言以及FIDIC的适用)的影响以及每个因素对这些问题的影响力。

著录项

  • 作者

    A. Saleh Ahmed Abubaker;

  • 作者单位
  • 年度 2014
  • 总页数
  • 原文格式 PDF
  • 正文语种 en