Effective Risk Positioning through Automated Identification of Missing Contract Conditions from the Contractor's Perspective Based on FIDIC Contract Cases

机译:基于FIDIC合同案件,通过自动识别缺失合同条件的自动识别有效风险定位

获取原文
获取原文并翻译 | 示例
       

摘要

Defining, measuring, and dealing with contractual risks are crucial for successful construction projects because the contractual risks can lead to serious claims and disputes. In general, construction participants make a stipulation regarding their roles and responsibilities by contracting in order to prevent such claims and disputes. A common practice for preparing construction contracts is to modify the standard contract forms to reflect the interests of the given project from the owner's perspective. In this process, however, favorable clauses that may be beneficial to the contractor are often modified or even removed, causing significant potential risks to the contractor. Therefore, an in-depth review of contract terms and conditions is required to avoid future risks. This study presents a new proactive risk assessment model to identify missing contractor-friendly clauses in the owner's modified contract conditions from the contractor's point of view. A case study is used to demonstrate the proposed framework, and real-world project cases were analyzed to understand what type of contractor-friendly clauses would likely be omitted in the owner's modified contract. In this study, the developed model builds on rule-based natural-language processing (NLP) to analyze unstructured text data through preprocessing, syntactic analysis, and semantic analysis. The proposed data-driven risk assessment model is expected to reduce the extent of human errors by (1) identifying potential contractual risks that could arise disputes; and (2) supporting to develop an appropriate response strategy for the given risks.
机译:定义,衡量和处理合同风险对于成功的建设项目至关重要,因为合同风险可能导致严重的索赔和纠纷。一般而言,建设参与者通过承包来规定他们的角色和责任,以防止此类索赔和纠纷。准备施工合同的常见做法是修改标准合同表格,以反映所有者的角度来审视给定项目的利益。然而,在这一过程中,可能对承包商有益的有利条款通常被修改甚至移除,对承包商带来了显着的潜在风险。因此,需要对合同条款和条件进行深入审查来避免未来的风险。本研究提出了一种新的主​​动风险评估模型,以从承包商的角度来确定所有者修改的合同条件中的缺失承包商友好条款。案例研究用于展示拟议的框架,并分析了现实世界的项目案例,以了解业主修改合同中可能会省略哪种类型的承包商友好条款。在本研究中,开发的模型在基于规则的自然语言处理(NLP)上建立了通过预处理,句法分析和语义分析来分析非结构化文本数据。预计建议的数据驱动风险评估模型将减少人类错误的程度(1)确定可能产生争议的潜在合同风险; (2)支持为特定风险制定适当的响应策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号