首页>
外文OA文献
>Appendix F: Engineer's Determination Within the Ambit of the 1999 Edition of the FIDIC Contract Forms: A Case Study of Contractor's Claims in Respect of Sand and Gravel Borrow Areas
【2h】
Appendix F: Engineer's Determination Within the Ambit of the 1999 Edition of the FIDIC Contract Forms: A Case Study of Contractor's Claims in Respect of Sand and Gravel Borrow Areas