首页> 外文OA文献 >An approach to rescheduling activities based on determination of priority and disruptivity
【2h】

An approach to rescheduling activities based on determination of priority and disruptivity

机译:一种基于确定优先级和破坏性来重新安排活动的方法

摘要

A constraint-based scheduling system called SPIKE is being used to create long term schedules for the Hubble Space Telescope. Feedback for the spacecraft or from other ground support systems may invalidate some scheduling decisions and those activities concerned must be reconsidered. A function rescheduling priority is defined which for a given activity performs a heuristic analysis and produces a relative numerical value which is used to rank all such entities in the order that they should be rescheduled. A function disruptivity is also defined that is used to place a relative numeric value on how much a pre-existing schedule would be changed in order to reschedule an activity. Using these functions, two algorithms (a stochastic neural network approach and an exhaustive search approach) are proposed to find the best place to reschedule an activity. Prototypes were implemented and preliminary testing reveals that the exhaustive technique produces only marginally better results at much greater computational cost.
机译:基于约束的计划系统称为SPIKE,用于为哈勃太空望远镜创建长期计划。航天器或其他地面支持系统的反馈可能会使某些调度决定无效,因此必须重新考虑相关活动。定义了功能重新安排优先级,该功能针对给定活动执行启发式分析并产生相对数值,该数值用于按应重新安排它们的顺序对所有此类实体进行排名。还定义了功能中断性,该功能性中断性用于将相对数字值放置在将要更改的现有计划中,以便重新计划活动。利用这些功能,提出了两种算法(随机神经网络方法和穷举搜索方法)来找到重新安排活动的最佳位置。实施了原型并进行了初步测试,结果表明穷举技术仅以稍高的计算成本产生了略微更好的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号