首页> 美国政府科技报告 >Analysis of Capacity and Traffic Operations Impacts of the World Trade Bridge in Laredo.
【24h】

Analysis of Capacity and Traffic Operations Impacts of the World Trade Bridge in Laredo.

机译:拉雷多世界贸易桥梁的容量和交通运营影响分析。

获取原文

摘要

Project 0-1800 pioneered the use of modern micro-simulation software to analyze the complex procedures involved in international border crossings. The animated models simulate the entire southbound commercial traffic flow, starting with U.S. Customs export inspections on the U.S. side, all the way to the Mexican exit gates. The results were impressive, including identification of bottlenecks, test of possible solutions, and estimate of future impacts of traffic on crossing times and on adjacent roadways. This report presents the analysis of the World Trade Bridge in Laredo, TX, which was under construction while the model was being developed. The model indicates that the World Trade Bridge will work under capacity and with few or no queues for the first five years. After that, congestion builds up, and in 2010 the facility will no longer support its average daily traffic. The model indicates that, in addition to expanding infrastructure, the solution for future congestion in Laredo will require demand management strategies to modify the hourly distribution, decrease the number of empty trucks, and increase the attractiveness of Laredo's Columbia Bridge.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号