首页> 美国政府科技报告 >Innovative Lock Design. Report 1. Case Study, New McAlpine Look Filling and Emptying System, Ohio River, Kentucky, Hydraulic Model Investigation
【24h】

Innovative Lock Design. Report 1. Case Study, New McAlpine Look Filling and Emptying System, Ohio River, Kentucky, Hydraulic Model Investigation

机译:创新的锁具设计。报告1.案例研究,新的mcalpine外观填充和清空系统,俄亥俄河,肯塔基州,水力模型调查

获取原文

摘要

Navigation improvements planned for the McAlpine Lock and Dam project on the Ohio River provided the proto-type for the laboratory model used in this study. The model was used to evaluate the in-chamber longitudinal culvert filling-and- emptying system (ILCS). In the ILCS, lock filling and emptying culverts are placed inside the lock chamber rather than in the lock walls, resulting in significant savings in lock wall construction. The ILCS also features a through-the-sill intake and discharge outlet with a longitudinal in- chamber filling-and-emptying system. Various discharge systems for the ILCS were evaluated. Construction of the filling and emptying culverts on the lock floor between the lock walls was found to be a viable design.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号