首页> 美国政府科技报告 >Tele-Ergonomics Assessment Methodologies Study
【24h】

Tele-Ergonomics Assessment Methodologies Study

机译:远程人体工程学评估方法研究

获取原文

摘要

The two primary problems encountered in this study were with the Institutional Review Board (IRB) approval and unexpected staff turnover. This minimal risk proposal was submitted to the MRMC IRB for approval as CHPPM does not have an IRB. The MRMC IRB had been used as the primary IRB in the past and it was assumed that the MRMC IRB approval was all that would be required; however, after the proposal had been reviewed, corrected and re-submitted, the PI was informed that the proposal would need to be submitted to each of the IRBs for the target bases. Since time was a concern, it was decided to re-target bases under one IRB rather than submit the proposal to four different IRBs. The target bases were changed to Fort Drum, Fort Eustis, Fort Knox, Fort Lee and Fort Bragg. All of these bases fall under the WRAMC IRB. The proposal received WRAMC IRB approval without any problem. Unfortunately, this time delay could have been avoided if the PI had been informed that the MRMC approval alone would not suffice. The unexpected staff turnover created delays in the final analysis of the data. All of the data had been collected prior to the staff member's departure; however, not all of the data had been entered for analysis and only a very few analyses had been conducted.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号