首页> 美国政府科技报告 >Master Plan, Tucson Diversion Channel, Recreation Development Program. Gila River and Tributaries, Arizona and New Mexico
【24h】

Master Plan, Tucson Diversion Channel, Recreation Development Program. Gila River and Tributaries, Arizona and New Mexico

机译:总体规划,图森分流渠道,娱乐发展计划。吉拉河和支流,亚利桑那州和新墨西哥州

获取原文

摘要

The proposed recreation development project will be built on county-owned lands originally acquired for flood control. Approximately 20 acres, acquired by Pima County, will be needed for access, parking, and operation of the facility. Flood control will remain the primary purpose to the detention basin. This report will demonstrate that the proposed dryland and water-based recreation facilities can be incorporated without sacrificing the basin's efficiency or design capacity. The master plan for the Tucson Detention Basin will serve as a guide to insure optimum development of the basin's natural and recreation resources. This plan is based on an inventory and analysis of the opportunities and constraints for recreation development. The physical plan for recreation development, the proposed phasing, and the associated costs and benefits for the project will be presented. The master plan will provide a general overview of the existing flood control features. It will present a concise analysis of both local and regional recreation demands and of existing and future land uses. Also, it will describe the basin's natural resources - how they will be used and impacted by the proposed development, and how the proposed recreation facilities will be incorporated into the existing flood control structure.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号