首页> 外文期刊>Eisenbahntechnische Rundschau >Vom Einbau bis zum Probebetrieb des 'Gotthard-Basistunnels'
【24h】

Vom Einbau bis zum Probebetrieb des 'Gotthard-Basistunnels'

机译:从“圣哥达基础隧道”的安装到试运行

获取原文
获取原文并翻译 | 示例
           

摘要

The New Rail Link through the Alps ("NEAT") forms a central element in a European transport corridor. Seen in its entirety, that route runs from Rotterdam to Genoa, and the intention is to increase the transport and travel capacities of one of Europe's most important transport axes. At the heart of the new axis is the Gotthard Base Tunnel, which has been described as the engineering work of the century. A company called IMC GmbH has been in charge of the specialist side of commissioning and execution of the technical railway systems and as such has provided various support activities within the framework of top-level overall coordination.%Die neue Eisenbahn-Alpentransversale (NEAT) ist das Herzstück des europäischen Verkehrskorridors. Die Gesamtstrecke verläuft von Rotterdam nach Genua und soll die Transport- und Reisekapazitäten auf einer der wichtigsten Verkehrsachsen Europas erhöhen. Kernstück der neuen Achse ist das Jahrhundert-Bauwerk Gotthard-Basistunnel. Die IMC GmbH übernahm im Rahmen der Fachleitung Inbetriebsetzung (IBS) und Ausführung (AU) der Bahntechnik verschiedene Unterstützungsleistungen in der übergeordneten Gesamtkoordination.
机译:穿越阿尔卑斯山的新铁路线(“ NEAT”)构成了欧洲运输走廊的核心元素。从整体上看,这条路线从鹿特丹到热那亚,其目的是增加欧洲最重要的交通枢纽之一的运输和旅行能力。新轴线的核心是圣哥达基础隧道,它被描述为本世纪的工程工作。一家名为IMC GmbH的公司负责技术铁路系统的调试和执行的专家方,因此在高层总体协调框架内提供了各种支持活动。%新的铁路高山交叉(NEAT)是欧洲运输走廊的心脏。整个路线从鹿特丹到热那亚,旨在增加欧洲最重要的交通枢纽之一的运输和旅行能力。新轴线的核心是本世纪的圣哥达基础隧道。在铁路技术的调试(IBS)和执行(AU)管理的框架内,IMC GmbH在总体协调中接管了各种支持服务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号