【24h】

No tilt, no paths

机译:没有倾斜,没有路径

获取原文
获取原文并翻译 | 示例
       

摘要

DRR's tight specification for the future WCML timetable contains a number of provisions that are likely tc restrict opportunities for open-access operators. They include several restrictions beyond the single hourly path tc and from London, the off-peak nature of these paths and the need to use tilting rolling stock.rnORR has specifically instructed Network Rail that the following options are not to be developed further in the prototype timetable:rnany aspirations that require uncommitted infrastructure enhancements; 110 mile/h paths on the Fast Lines between Euston and Crewe; additional 125 mile/h Fast Line paths to/from Euston beyond those described in its preferred Scenario 1; any additional Slow Line paths between Euston, Northampton and Rugby other than those required to meet freight growth forecasts; and any removal of Fast Line calls at Watford Junction 'because of the detrimental effect on what is already considered to be a poorly-served station'.
机译:DRR对未来WCML时间表的严格规范包含许多规定,这些规定可能会限制开放访问运营商的机会。它们包括除单一小时路径tc和伦敦以外的一些限制,这些路径的非高峰性质以及使用倾斜机车车辆的需要。rnORR特别指示Network Rail,以下选项不在原型中进一步发展。时间表:需要不做任何基础设施改进的任何愿望;在Euston和Crewe之间的快速线上行驶110英里/小时的路径;除首选方案1中所述之外,往返于Euston的额外125英里/小时快速线路路径; Euston,Northampton和Rugby之间的其他慢线路径,以满足货运增长预测所需的路径;以及在沃特福德交汇处拆除快线电话的原因是“由于对已经被认为服务不佳的车站产生了不利影响”。

著录项

  • 来源
    《Rail business intelligence》 |2010年第377期|p.2|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:16:10

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号