首页> 外文期刊>Mathematical Problems in Engineering >An Interval-Based Evolutionary Approach to Portfolio Optimization of New Product Development Projects
【24h】

An Interval-Based Evolutionary Approach to Portfolio Optimization of New Product Development Projects

机译:基于间隔的进化方法,用于新产品开发项目的投资组合优化

获取原文
获取原文并翻译 | 示例

摘要

The growth of large enterprises in the manufacturing market commonly depends on good New Product Development (NPD) projects; these projects represent a strategy to overcome competitors inside a competitive environment. The management of such projects is usually complex and involves risk due to the changing and conflicting environment. The approaches that tackle the problem lack an explicit consideration of the DM's attitude facing uncertainty and imprecision related to the risk and particularly in the presence of time-interdependencies. This paper proposes a model of the time-related effects, under imperfect knowledge, and their influence in choosing optimal NPD portfolios. The proposed approach is an interval-based method to solve NPD portfolio optimization problems under different forms of imperfect knowledge. This approach has the advantage of a unified and simple way to model the different sources of imprecision, vagueness, uncertainty, and arbitrariness. The attitude of the DM facing the imperfect knowledge is adjusted by using some meaningful parameters. The research focuses particularly in creating a method useful for risk-averse DMs. The proposal was tested through an experimental design that compared the results achieved by the new method against the expected value in portfolios. The results revealed that high levels of conservatism might prevent wasting resources in failed projects.
机译:制造市场中大型企业的增长通常取决于良好的新产品开发(NPD)项目;这些项目代表了克服竞争环境内的竞争对手的策略。这些项目的管理通常是复杂的,并且由于环境变化和矛盾的环境而涉及风险。解决问题的方法缺乏明确考虑DM面对与风险相关的不确定性和不确定的态度,特别是在时间相互依赖的情况下。本文提出了一种在不完美知识的时间相关效果的模型,以及它们在选择最佳NPD组合时的影响。所提出的方法是基于间隔的方法,以解决不同形式的不完全知识的NPD产品组合优化问题。这种方法具有统一和简单的方式来模拟不同的不精确来源,模糊性,不确定性和武装来源。通过使用一些有意义的参数来调整DM面临不完美知识的态度。该研究特别侧重于创建一种可用于风险厌恶DMS的方法。通过实验设计测试了该提案,这些设计将通过新方法与投资组合中的预期价值进行了比较了所实现的结果。结果表明,高水平的保守主义可能会阻止失败的项目中的资源。

著录项

  • 来源
    《Mathematical Problems in Engineering》 |2019年第16期|4065424.1-4065424.18|共18页
  • 作者单位

    Autonomous Univ Sinaloa Fac Civil Engn Sinaloa 80040 Mexico;

    Madero Inst Technol Natl Mexican Inst Technol Postgrad & Res Div Tamaulipas 89440 Mexico;

    Madero Inst Technol Natl Mexican Inst Technol Tamaulipas 89440 Mexico;

    Madero Inst Technol Natl Mexican Inst Technol Postgrad & Res Div Tamaulipas 89440 Mexico;

    Madero Inst Technol Natl Mexican Inst Technol Postgrad & Res Div Tamaulipas 89440 Mexico;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号