首页> 外文期刊>Journal of Transportation Engineering >Development of Emergency Track Beam Alignment for Rapid Track Beam Replacement of Straddle Monorail Transit
【24h】

Development of Emergency Track Beam Alignment for Rapid Track Beam Replacement of Straddle Monorail Transit

机译:跨式单轨交通快速更换轨道束的应急轨道束对准技术的发展

获取原文
获取原文并翻译 | 示例
       

摘要

Prestressed concrete (PC) track beams are the important component of straddle monorail transit systems. To ensure the normal operation of straddle monorail transit, a type of prefabricated steel track beam, termed an emergency track beam (ETB), is used for rapid replacement of destroyed PC track beams. The object of this paper is to analyze the design of ETB alignment to satisfy the rapid replacement of PC track beams for all types of alignments. This paper describes the structural design and replacement principles of ETB. According to an analysis of six types of PC track beam segment alignments, two types of circular curves, R_e = oo and 180 m, are considered as the ETB plane curve, a straight line is considered as the ETB vertical curve, and superelevation can be achieved by a cast-in-place concrete layer over the running panel of the ETB. The writers quote PC track beams in Chongqing, China, for instance analysis to verify the alignment design of ETBs. The paper also presents the typical cost and construction process of ETBs in Chongqing. This paper shows that ETB structural and alignment design can fulfill the requirement of rapid replacement of PC track beams.
机译:预应力混凝土(PC)轨道梁是跨骑单轨运输系统的重要组成部分。为确保跨骑单轨运输的正常运行,一种称为紧急轨道梁(ETB)的预制钢轨道梁用于快速更换损坏的PC轨道梁。本文的目的是分析ETB对准的设计,以满足所有对准类型对PC轨道光束的快速替换。本文介绍了ETB的结构设计和替换原理。根据对六种PC轨道梁节段对准的分析,将两种类型的圆形曲线R_e = oo和180 m视为ETB平面曲线,将一条直线视为ETB垂直曲线,并且可以将超高设为通过在ETB的运行板上覆盖现浇混凝土层来实现。本文作者引用了中国重庆的PC轨道梁进行分析,以验证ETB的对准设计。本文还介绍了重庆市ETB的典型成本和建设过程。本文表明,ETB的结构和对准设计可以满足快速更换PC轨道梁的要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号