首页> 外文期刊>Engineers Australia >AWD project plagued with obstacles
【24h】

AWD project plagued with obstacles

机译:AWD项目遇到障碍

获取原文
获取原文并翻译 | 示例
       

摘要

Steve Ludlam, mechanical engineer and one of Engineers Australia magazines Top 100 most influential engineers for 2014, chose not to renew his contract at the helm of ASC in July despite having played a key role in the development of major defence projects over the last four years. The shock resignation of the CEO and managing director of the government-owned enterprise in Adelaide resulted in front page headlines highlighting the controversy surrounding the $8.5 billion construction of three Air Warfare Destroyers (AWD) due for delivery between early 2016 and 2019.
机译:史蒂夫·卢德兰(Steve Ludlam)是机械工程师,也是《澳大利亚工程师》杂志2014年最有影​​响力的100名工程师之一,尽管在过去四年中在重大国防项目的开发中发挥了关键作用,但他选择不续签7月份由ASC领导的合同。阿德莱德这家国有企业的首席执行官和董事总经理的震惊辞职导致头版头条突出显示了围绕耗资85亿美元建造的三架空战驱逐舰(AWD)的争议,这些飞机将于2016年初至2019年交付。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号