首页> 外文期刊>BMC Medical Informatics and Decision Making >Construction of exchange integrated information chain management model leading by information nurse for large instrument and equipment in operating room
【24h】

Construction of exchange integrated information chain management model leading by information nurse for large instrument and equipment in operating room

机译:施工综合信息链管理模型在手术室大型仪表和设备领域

获取原文
           

摘要

This study aims to explore the information chain management model of large instrument and equipment inter-working in the operating room (OR) led by information nurses. Through the chain management process of large instruments and equipment in the OR, which was based on information nurses, the management model of inter-working and integrating information chain was established, the key links were controlled, and the whole life cycle management of instruments and equipment from expected procurement to scrapping treatment was realized. Using the cluster sampling method, 1562 surgical patients were selected. Among these patients, 749 patients were assigned to the control group before the running mode, and 813 patients were assigned to the observation group after the running mode. The related indexes for large instrument and equipment management in the department before and after the running mode were compared. In the observation group, the average time of equipment registration was (22.05?±?2.36), the cost was reduced by 2220?yuan/year, and the satisfaction rate of the nursing staff was 97.62%. These were significantly better, when compared to the control group (P??0.05). Furthermore, the awareness rate of the whole staff for equipment repair application was 95.12%, and the arrival time of maintenance personnel and the examination and approval time of equipment management were greatly shortened (P??0.05). The integrated management model of large instrument and equipment interworking in the OR based on chain flow realizes the whole life cycle management of instruments and equipment, which is essential to improve management efficiency.
机译:本研究旨在探索由信息护士领导的手术室(或)在操作室(或)中的大型仪器和设备的信息链管理模型。通过基于信息护士的大型仪器和设备的链管理过程,建立了相互作用和集成信息链的管理模式,控制关键链接,以及仪器的整个生命周期管理实现了从预期采购的设备,实现了报废治疗。使用簇采样方法,选择了1562名手术患者。在这些患者中,在运行模式之前将749名患者分配给对照组,并在运行模式后分配了813名患者。比较了运行模式前后大型仪器和设备管理的相关索引。在观察组中,设备登记的平均时间(22.05?±2.36),成本减少了2220年?元/年,护理人员的满意度为97.62%。与对照组相比,这些显着更好(p≤≤0.05)。此外,设备维修申请的全体员工的认识率为95.12%,而且维护人员的到货时间和设备管理的检查和批准时间大大缩短(P?&?0.05)。基于链流程的大型仪器和设备互通的综合管理模型实现了仪器和设备的整个生命周期管理,这对于提高管理效率至关重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号