首页> 外文期刊>Construction News >Massive machine lifts M56 bridge
【24h】

Massive machine lifts M56 bridge

机译:大型机器升降机M56桥

获取原文
获取原文并翻译 | 示例
           

摘要

Highways England's pinch-point programme sees contractors deliver smaller-scale targeted improvements to the strategic road network to relieve congestion and improve safety. But in the process of carrying out projects in the programme, care must be taken to minimise any extra disruption caused by the construction process itself. This was the task given to the Balfour Beatty Mott MacDonald joint venture appointed to carry out Highways England's Area 10 Asset Support Contract in 2012. One of the schemes BBMM has had to carry out is the replacement of the Thorley Lane Bridge over the M56 - a project shortlisted for this year's Construction News Awards.
机译:英格兰公路局的关键点计划是,承包商对战略道路网络进行规模较小的有针对性的改进,以缓解拥堵并提高安全性。但是在执行计划中的项目的过程中,必须注意将由施工过程本身引起的任何额外干扰降至最低。这是授予Balfour Beatty Mott MacDonald合资企业的任务,该合资企业于2012年被指定执行英格兰高速公路10区资产支持合同。BBMM必须执行的计划之一是更换M56上的Thorley Lane桥-a该项目入围了今年的建设新闻奖。

著录项

  • 来源
    《Construction News》 |2016年第7456期|30-31|共2页
  • 作者

    Daniel Kemp;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号