Britain's biggest mobile crane lowered into place a 35m span bowstring arch bridge over Shoreditch High Street last weekend as part of the main package of works on the East London Line (ELL). It is the first of three new bridges being installed on the route by the Balfour Beatty/ Carillion joint venture and steelwork fabricator Fairfield Mabey as part of the £363M main works package to deliver Transport for London's £1bn upgrade of the line, which will see it run from West Croydon in South London to Dalston in the north.
展开▼
机译:上周末,英国最大的移动式起重机在肖尔迪奇高街(Shoreditch High Street)上放下了一座35m跨度的弓形拱桥,这是东伦敦线(ELL)主要工程计划的一部分。这是Balfour Beatty / Carillion合资企业和钢结构制造商Fairfield Mabey在路线上安装的三座新桥中的第一座,这是£ 363M主工程包的一部分,将为伦敦10亿英镑的铁路升级工程提供运输服务。它从伦敦南部的西克罗伊登(West Croydon)到北部的达尔斯顿(Dalston)。
展开▼