...
首页> 外文期刊>New civil engineer >Massive Crane Lifts Stockton Bridge Arch
【24h】

Massive Crane Lifts Stockton Bridge Arch

机译:大型起重机升降机斯托克顿桥拱

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The main arch of the North Shore footbridge across the River Tees at Stockton was successfully launched last Friday despite incessant rain. Onlookers braved the elements to see the 170t, 120m span main arch lowered into place using the UK's largest mobile crane. The operation happened between the early hours of Friday morning and Friday lunchtime, creating an immediate impact on the local skyline. "Today is a major milestone in the project. We've lifted the main arch which is 170t - it's a significant event," said White Young Green project manager Peter Wood. "We've still a long way to go, installing decking, handrailing and lighting but we hope that in years to come the structure will become iconic in its own right." The main arch is echoed by its smaller sister which was lifted into place in July. The smaller arch spans 60m to an off-centre pier and from there the main arch spans a further 120m. The main arch is approximately 32m high.
机译:尽管雨水不断,上周五在斯托克顿横跨蒂斯河的北岸人行天桥主拱已成功启动。围观者很勇敢地看到使用英国最大的移动式起重机将170t,120m跨度的主拱降下到位。手术发生在星期五早上的凌晨至星期五的午餐时间之间,对当地的天际线产生了直接影响。 White Young Green项目经理Peter Wood说:“今天是该项目的一个重要里程碑。我们已经吊起了170t的主拱门,这是一个重大事件。” “我们还有很长的路要走,安装甲板,扶手和照明设备,但我们希望在未来的几年中,该结构本身将成为标志性建筑。”主拱被其较小的姐妹呼应,后者于7月举起就位。较小的拱跨距偏心墩60m,从那里主拱跨距120m。主拱高约32m。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号