首页> 外文会议>Engineers' Society of Western Pennsylvania;Annual International Bridge Conference >Lifting over the Piscataqua - A New Lift Bridge for Maine and New Hampshire
【24h】

Lifting over the Piscataqua - A New Lift Bridge for Maine and New Hampshire

机译:在Piscataqua上吊起-缅因州和新罕布什尔州的新吊桥

获取原文

摘要

The new 300-ft vertical lift bridge crossing the Piscataqua River between Maine and New Hampshireintroduces new design features to carry vehicular, pedestrian and freight rail traffic. The design of the Sarah LongBridge successfully utilized the CM/GC (Construction Manager/General Contractor) process throughout preliminaryconcepts through final design, environmental permitting, and ROW, in a period of 21 months. This process, aswell as the innovative design techniques that maximized project value, are described hereinafter.
机译:横跨缅因州和新罕布什尔州的皮斯卡塔夸河的新的300英尺垂直吊桥 引入了新的设计功能来承载车辆,行人和货运铁路交通。莎拉·朗(Sarah Long)的设计 在整个初期阶段,Bridge成功地利用了CM / GC(施工经理/总承包商)流程 在21个月内完成最终设计,环境许可和ROW。这个过程,作为 以下将介绍最大化项目价值的创新设计技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号