首页> 外文期刊>Computers & operations research >Developing A Coordinated Vendor-buyer Model In Two-stage Supply Chains With Stochastic Lead-times
【24h】

Developing A Coordinated Vendor-buyer Model In Two-stage Supply Chains With Stochastic Lead-times

机译:在具有提前期的两阶段供应链中开发供应商-买方协调模型

获取原文
获取原文并翻译 | 示例

摘要

This paper develops an approach to determine the optimal production and shipment policy for an integrated vendor-buyer problem. The vendor manufactures the product in batches at a finite rate and ships the output to the buyer. All shipments to the buyer are equal-sized batches. Despite previous papers in the literature, we assume that the supply lead-time between vendor and buyer is stochastic and shortage is also allowed. The objective is to minimize the expected total cost of both buyer and vendor. We derive the expected annual integrated total cost function and propose an analytic solution procedure to determine the optimal policy. To illustrate the significance of cost-reduction of the integrated approach in comparison with independent decisions by buyer or vendor, some numerical examples are also presented.
机译:本文提出了一种方法,用于确定针对集成的卖方-买方问题的最佳生产和运输策略。卖方以有限的速度批量生产产品,然后将输出装运给买方。所有发给买方的货物都是相同大小的批次。尽管文献中已有论文发表,但我们假设卖方和买方之间的供应提前期是随机的,并且也允许短缺。目的是最小化买卖双方的预期总成本。我们推导出了预期的年度综合总成本函数,并提出了一种解析解决方案程序来确定最佳策略。为了说明与买方或卖方的独立决策相比,降低集成方法的成本的重要性,还提供了一些数字示例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号