机译:Identification and generalisability of key causes of challenges in the implementation of IPD contract in construction projects with the perspective of Iran road construction projects
机译:A model-based decision framework for the multi-depot multi-travelling salesman problem with split and delivery demand considering different key performance indicators
机译:The efficient routing approach of a vehicle under the vehicle routing problem with simultaneous delivery and pickup for reducing the fuel consumption and pollutants emission
机译:Stochastic analysis of an imperfect production-inventory system with consideration of random machine breakdown, rework, inspection, and environmental emissions
机译:Prognosis of failures due to the abnormal temperature increase of the malt crusher, using ANFIS neuro-fuzzy approach: case study of the flour mill of the breweries of Cameroon
机译:Design of a mathematical model and a simulation-optimisation approach for master surgical scheduling considering uncertainty in length of stay, demands and duration of surgery
机译:Implementation and evaluation of an ergonomic training program and stretch exercises among welders in the informal sector in three urban centres in Zimbabwe