Geotechnical influence on existing subway tunnels induced by multiline tunneling in Shanghai soft soil

机译:上海软土中多线隧道对既有地铁隧道的岩土影响

获取原文
获取原文并翻译 | 示例
       

摘要

Multiline tunneling construction in soft soil significantly impedes risk control and environmental protection. Current research has investigated on the effect of single-line shield excavation on surrounding environments and tunneling for parallel-crossing or perpendicular down-crossing underground structures. However, minimal attention has been given to soil disturbances induced by multiline tunneling and complex overlapped interaction mechanics for adjacent structures, such as existing above-crossing and down-crossing subway tunnels. Few studies focus on oblique crossing construction and setting rules for the operation parameters of shield machines. Based on the Shanghai Railway transportation project and in situ monitoring data, the deformation analyses of existing subway tunnels induced by an earth pressure balance (EPB) shield during the process of above-overlapped and down-overlapped crossing tunnels with oblique angles are presented. The deformation analyses employ the three-dimensional finite element (3D FE) numerical simulation method, and the simplified analytical method. The analysis results from the theoretical methods are consistent with the monitoring data. The setting rules of multiline propulsion main parameters, including the earth pressure for cutting open, and the synchronized grouting, are also established. This study may provide a theoretical basis for the development of properly overlapped crossing schemes and geotechnical protective measures during multiline tunneling construction in soft soil.
机译:在软土中的多线隧道施工显着阻碍了风险控制和环境保护。当前的研究已经研究了单线盾构开挖对周围环境和平行交叉或垂直向下交叉的地下结构的影响。但是,对于由多线隧道和相邻结构(例如现有的上下交叉地铁隧道)的复杂重叠相互作用机制引起的土壤扰动,人们的关注很少。很少有研究集中在斜交施工和盾构机运行参数设定规则上。基于上海铁路运输工程和现场监测数据,提出了现有的地铁隧道在地上压力平衡(EPB)盾构在斜交上下交叠隧道过程中的变形分析。变形分析采用三维有限元(3D FE)数值模拟方法和简化分析方法。理论方法的分析结果与监测数据吻合。建立了多线推进主要参数的设定规则,包括开挖土压力和同步灌浆。该研究可为软土地基多线隧道施工中适当重叠的穿越方案和岩土防护措施的开发提供理论依据。

著录项

  • 来源
    《Computers and Geotechnics》 |2014年第3期|121-132|共12页
  • 作者

    Zhiguo Zhang; Maosong Huang;

  • 作者单位

    School of Environment and Architecture, University of Shanghai for Science and Technology, 516 Jungong Road, Shanghai 200093, China,Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University, Shanghai 200092, China,State Key Laboratory for Ceomechanics and Deep Underground Engineering, China University of Mining and Technology, Xuzhou 221116, China;

    Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University, Shanghai 200092, China,Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    EPB shield; Multiline tunneling; Geotechnical deformation; Simplified analysis; Numerical simulation; Case history;