Tunnel ventilation during construction and diffusion of hazardous gases studied by numerical simulations

机译:用数值模拟研究的施工和扩散过程中的隧道通风

获取原文
获取原文并翻译 | 示例
       

摘要

Proper ventilation of tunnels has remained a serious issue for many years. However, only empirical methods are currently utilised for estimating ventilation time scales in construction scheduling. In this study, the forced ventilation system used in tunnels under construction was investigated through computational fluid dynamics modelling. The effects of influencing factors, such as the duct position, distance between the ventiduct mouth and the working face, air velocity in the duct, and cross-sectional area of the tunnel, were examined, and the flow field and CO concentration distributions in the tunnel space were determined. The obtained results revealed that the zone near the working face can be divided into a jet zone, backflow zone, and vortex zone. Pollutant discharge was strongly related to the flow field distribution. The CO concentration distributions were calculated from the data sets generated by various models, and a ventilation time estimation function was derived for the entire tunnel construction period. The blasting cycle can be significantly shortened by allowing construction workers to enter the tunnel within the calculated entry periods, and necessary construction procedures can be reasonably implemented. The flow field distribution and time dependence of the CO concentration deduced in this study can be extended and applied to other similar projects.
机译:多年来,隧道的适当通风仍然是一个严重的问题。然而,目前仅用于估计施工调度中的通气时间尺度的经验方法。在本研究中,通过计算流体动力学建模研究了正在建设中的隧道中使用的强制通风系统。影响因素的影响,例如管道位置,通气口与工作面之间的距离,管道的空气速度以及隧道的横截面区域,以及流场和CO浓度分布确定隧道空间。所获得的结果表明,工作面附近的区域可分为喷射区,回流区和涡旋区域。污染物排放与流场分布密切相关。通过各种模型产生的数据集计算CO浓度分布,并且为整个隧道施工周期推导出通风时间估计函数。通过允许建筑工人在计算的入境周期内进入隧道,可以显着缩短爆破周期,并且可以合理地实施必要的施工程序。该研究中推导的CO浓度的流场分布和时间依赖性可以延长并应用于其他类似项目。

著录项

  • 来源
    《Building and Environment》 |2020年第6期|106902.1-106902.14|共14页
  • 作者单位

    Xian Univ Technol State Key Lab Base Ecohydraul Engn Northwest Arid Xian 710048 Peoples R China;

    Xian Univ Technol State Key Lab Base Ecohydraul Engn Northwest Arid Xian 710048 Peoples R China|China Three Gorges Univ Coll Hydraul & Environm Engn Yichang 443002 Peoples R China;

    Beijing Engn Corp Ltd Beijing 100024 Peoples R China;

    Xian Univ Technol State Key Lab Base Ecohydraul Engn Northwest Arid Xian 710048 Peoples R China;

    Xian Univ Technol State Key Lab Base Ecohydraul Engn Northwest Arid Xian 710048 Peoples R China;

    Xian Univ Technol State Key Lab Base Ecohydraul Engn Arid Area Xian 710048 Peoples R China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Tunnel under construction; Forced ventilation; Pollutant transport; Computational fluid dynamics simulation;

    机译:隧道正在建设中;强制通风;污染物运输;计算流体动力学模拟;