...
【24h】

Out of Joint

机译:脱节

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Joint defense acquisition programs have a poor track record. Much more than single-service projects, they have a habit of racking up significant cost increases and schedule delays, and many run into trouble during testing. Defense leaders can't quite nail down the reason, but they are preparing to do a "deep dive" to figure out why. "We seem to have a lot of difficulty with joint programs," Pentagon Comptroller Robert F. Hale said at a March acquisition conference in Arlington, Va. "We're trying to get a handle on ... what's behind this." It's not a new problem. According to a study in CrossTalk: The Journal of Defense Software Engineering, joint programs from 1997-2005 were on average about twice as likely to have schedule, development, or other problems compared to those managed by a single service. In the research, development, test, and evaluation phase, joint efforts were three times more likely to have trouble.
机译:联合国防采购计划的往绩不佳。它们比单项服务项目要多得多,它们习惯于导致大量的成本增加和进度延迟,并且在测试过程中遇到许多麻烦。国防领导人不能完全确定原因,但他们正准备进行一次“深入研究”以找出原因。五角大楼主计长罗伯特·黑尔(Robert F. Hale)在3月在弗吉尼亚州阿灵顿举行的一次收购会议上说:“联合计划似乎有很多困难。我们正在努力解决……背后的原因。”这不是一个新问题。根据CrossTalk:《国防软件工程杂志》中的一项研究,与单一服务管理的计划相比,1997年至2005年的联合计划出现计划,开发或其他问题的平均可能性大约是其两倍。在研究,开发,测试和评估阶段,共同努力的可能性要高出三倍。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号