首页> 中文期刊> 《现代交通技术》 >高墩大跨连续刚构桥气弹模型风洞试验研究

高墩大跨连续刚构桥气弹模型风洞试验研究

         

摘要

The construction state of large-span continuous rigid frame bridge with high piers is the weak link in the wind-resistant. Taking the Sanshuihe bridge as an engineering background,the wind tunnel test for the aeroelastic model of longest double-cantilever construction state were made to analyze the wind-resistant behavior of the bridge. The wind tunnel tests for flutter and galloping of the bridge at the longest double-cantilever construction stage were made by the aeroelastic model with a scale of l:lO0,the critical flutter and galloping wind speed were measured in the tests and the wind-resistant behavior of the bridge was analyzed and assessed based on the results of the tests. The results show that the bridge has fairly good flutter and galloping stability.%高墩大跨连续刚构桥在施工阶段的抗风能力较弱,以三水河特大桥为工程背景,通过最大悬臂施工状态气弹模型的风洞试验,对其抗风性能就行了研究。采用1:100的缩尺模型比进行最大悬臂施工状态的颤振及驰振试验,测定颤振、驰振临界风速,据此分析评估该桥的抗风性能。风洞试验结果表明,该桥具有较好的颤振、驰振稳定性。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号