Time-Space-Activity Conflict Detection Using 4D Visualization in Multi-storied Construction Project

机译:多层建筑项目中使用4D可视化的时空活动冲突检测

获取原文
获取原文并翻译 | 示例

摘要

This study investigated whether a 4D model can help project participants of construction sites to detect possible errors in construction process. Identifying problems in work sequence and elements are possible when necessary measures are implemented to rectify the problems in advance using a 4D model. The common problem associated with a construction project is a time-space conflict which may lead to project delays and cost overrun. Construction space management and activity sequencing are important aspects for timely project completion within an estimated budget. This research explored the effective use of 4D visualization that could help overcome timespace problems. In order to fulfill this research goal, a 4D model was developed that incorporated spatial requirements along a chronological schedule of events. The model produced logical evidence that a 4D model could effectively be usedin a construction site to detect time-space conflicts.
机译:这项研究调查了4D模型是否可以帮助施工现场的项目参与者检测施工过程中可能出现的错误。当采取必要的措施提前使用4D模型纠正问题时,可以识别工作顺序和要素中的问题。与建设项目相关的常见问题是时空冲突,这可能导致项目延迟和成本超支。施工空间管理和活动排序是在预算范围内及时完成项目的重要方面。这项研究探索了4D可视化的有效使用,可以帮助克服时空问题。为了实现此研究目标,开发了一个4D模型,该模型沿事件的时间顺序结合了空间要求。该模型产生了逻辑证据,证明4D模型可以有效地在建筑工地中用于检测时空冲突。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号