The present invention by constructing the parts and structures of the facility in a three-dimensional form in the construction, by continuously implementing the completion state by construction progress schedule in a three-dimensional shape, to visualize the process progress to significantly improve the construction process management work It relates to a 4D construction process management system and its implementation method.;To this end, the present invention has constructed an automatic terrain triangle network construction method capable of visual expression by color classification for each design part, and expresses the actual construction shape that changes every time by construction schedule as the actual state when expressing the three-dimensional shape such as cut soil. In order to develop a morphing technique for the system.;In addition, the present invention has developed a visual progress management representation technique that expresses the progress management status of the actual progress schedule compared to the planned construction schedule in three dimensions by varying the color for each part and structure for the delay and overtime schedule, and completed facility parts In addition to the 4D implementation, the virtual reality (VR) function was linked to show the actual use status such as simulation driving, and introduced the function to identify the problem in advance.;In addition, the present invention is configured to use the wireless communication function to obtain the 4D construction information on-site, key map that can selectively implement 4D on the screen from the wide range to the detailed structure range for the comprehensive 4D implementation of the wide-area site ) Function.;In addition, for the comprehensive 4D implementation of the wide-area site, a key map function was implemented to selectively implement 4D on the screen from the wide range to the detailed structure range.;In addition, the present invention is to perform the construction schedule calculation, three-dimensional configuration of each object, 4D implementation, virtual reality implementation functions are all performed by the standard process classification system code for the performance of these functions completed by construction schedule It is possible to implement integrated management of my information and to implement related functions for each level.
机译:本发明通过在施工中以三维形式构造设施的零件和结构,通过以施工进度进度表以三维形状连续地实现完成状态,以可视化过程进度来显着改善施工过程管理工作涉及一种4D施工过程管理系统及其实现方法。为此,本发明构建了一种自动三角地形网构建方法,该方法可以对每个设计部分进行颜色分类可视化表达,并表达实际的施工情况。表示切土等三维形状时,根据施工进度每次变化的形状为实际状态。为了开发该系统的变形技术。另外,本发明开发了一种视觉进度管理表示技术,该可视进度管理表示技术通过改变颜色在三个维度上表达与计划的施工进度相比的实际进度进度的进度管理状态。每个零件和结构的延误和加班时间表,以及已完成的设施零件除了4D实施之外,还链接了虚拟现实(VR)功能以显示实际使用状态(例如模拟驾驶),并引入了该功能以识别另外,本发明被配置为使用无线通信功能在现场获取4D施工信息的关键图,该关键图可以选择性地在屏幕上从宽范围到详细结构范围实现4D显示。广域站点功能的全面4D实施);此外,全面4D实施在该广域站点中,实现了按键映射功能以从宽范围到详细结构范围选择性地在屏幕上实现4D。此外,本发明将执行施工进度表计算,三维配置每个对象的4D实现,虚拟现实实现功能均由标准过程分类系统代码执行,以实现由施工进度表完成的这些功能。可以对我的信息进行集成管理并为每个级别实现相关功能。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号