首页> 外文会议>SME annual meeting exhibit;CMA national western mining conference >MEANDU RISING: THE SECOND LIFE OF TARONG COAL PROJECT'S MEANDU MINE
【24h】

MEANDU RISING: THE SECOND LIFE OF TARONG COAL PROJECT'S MEANDU MINE

机译:孟都崛起:塔隆煤炭项目孟都煤矿的第二生命

获取原文

摘要

Rio Tinto Coal Australia built the Meandu Mine in 1983 expecting to deliver 25 years of cost effective energy to the Tarong Power Station, never expecting the massive changes that would impact those next 25 years and beyond. RTCA eventually lost faith in Meandu's ability to continue providing long term profitable coal, thus the decision to close Meandu and move to Kunioon beyond 2010. It took a change in ownership and fresh eyes to see that Meandu was not the washed-up has-been mine previously believed.
机译:澳大利亚力拓煤矿公司(Rio Tinto Coal Australia)于1983年建造了Meandu煤矿,该工程期望为Tarong电站提供25年的高性价比能源,但从未期望过将对未来25年及以后产生影响的巨大变化。 RTCA最终对Meandu继续提供长期可盈利煤炭的能力失去了信心,因此决定关闭Meandu并于2010年后迁至Kunioon。所有权的变化和新鲜的眼光使Meandu不再是被洗劫一空我以前相信。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号