首页> 外文期刊>Mining Engineering >Meandu rising: The second life of the Meandu Mine
【24h】

Meandu rising: The second life of the Meandu Mine

机译:均值上升:均值矿的第二生命

获取原文
获取原文并翻译 | 示例
           

摘要

Rio Tinto Coal Australia (RTCA) developed the Meandu Mine in Queensland, Australia in 1983 to supply thermal coal to the adjacent and newly constructed Tarong Power Station (TPS). In designing the mine, RTCA selected Meandu's best economic reserves for a 27-year life based reserves and found considerable coal available with economic potential. Working jointly with TEC, Thiess performed several analyses on Meandu and subsequently the Kunioon coal reserves. The results changed TEC's decision from expediting Kunioon's construction to instead continuing Meandu's operation for up to 15 additional years.
机译:力拓澳大利亚煤炭公司(RTCA)于1983年在澳大利亚昆士兰州开发了Meandu煤矿,向邻近的新建的塔荣电站(TPS)供应动力煤。在设计矿场时,RTCA选择了Meandu的最佳经济储量,以实现27年的基于生命的储量,并发现了具有经济潜力的大量煤炭。 Thiess与TEC合作,对Meandu和随后的Kunioon煤炭储量进行了多次分析。结果使TEC的决定从加速Kunioon的建造转变为将Meandu的运营再延长15年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号