首页> 外文期刊>Mining Engineering >Meandu rising: The second life of the Meandu Mine
【24h】

Meandu rising: The second life of the Meandu Mine

机译:均值上升:均值矿的第二生命

获取原文
获取原文并翻译 | 示例
           

摘要

Initial results showed coal extending in a basin 20-km- (12-mile-) long and 5-km- (3.1-km-) wide.n This plan was started from scratch, basically rebuilding every mine area, strip and block into a logical pit sequence that maximized pit lengths and optimized the coal seams recovered. Thiess provided the results to TEC for incorporation into its economic model to obtain a final NPV cost of energy to the power plant.
机译:初步结果显示,煤在一个20公里(12英里)长,5公里(3.1公里)宽的盆地中延伸。n该计划从头开始,基本上将每个矿区,条带和区块重建为合理的矿井序列,可最大化矿井长度并优化所采煤层。 Thiess将结果提供给TEC,以纳入其经济模型中,以获取发电厂的最终NPV能源成本。

著录项

  • 来源
    《Mining Engineering》 |2011年第4期|p.40-53|共14页
  • 作者

    J G Pippenger;

  • 作者单位

    J.G. Pippenger, member SME, is is site manager, Thiess Pty Ltd. Pty Ltd. Kingaroy, QLD, Australia, e-mail jpippenger@tniess.com.;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号