The Role of Mechanized Shaft Sinking in International Tunnelling Projects

机译:机械化轴下沉在国际隧道项目中的作用

获取原文

摘要

Tunnelling projects require shafts, either as start and reception shafts for the tunnelling process or for inspection, ventilation and rescue purpose. The current trend towards installations in growing depths is driven by deep sewers to avoid pumping stations and the need to build new installations below existing infrastructure.Inner-city shaft structures demand safe working principles for surrounding buildings and environment, especially regarding potential settlements. In addition, deep shafts need special attention for the safety of the operating personnel. The VSM method procures safety for the surrounding environment and for all personnel. As the water level in the shaft equals the groundwater level outside the shaft, there is no water flow which can cause ground movement. All installations including the lining erection are completed from the surface. No personnel have to enter the shaft until it has reached the final depth and is fully secured. The lining consists of either precast segments or cast in place concrete. As the lining installation is completed on the surface, a high quality installation can be reached. In most cases, a secondary lining is not required.The first VSM equipment was put into operation more than 15 years ago. Today, nearly 80 shafts of up to 85 m depth have been sunk worldwide using VSM. This paper will describe the role of shaft sinking in tunnelling projects along with all necessary safety and planning aspects when VSM is being discussed.
机译:隧道项目需要轴,无论是作为启动和接收轴的隧道过程或检查,通风和救援目的。目前的趋势朝着安装在成长的深度由深的下水道驱动,以避免泵站,建设低于现有infrastructure.Inner城市轴结构,新设备的需求要求安全的工作原则,为周围建筑和环境,特别是关于潜在的定居点。此外,深轴需要特别注意对操作人员的安全。该VSM方法采购安全的周边环境和所有人员。由于在轴的水位等于轴外侧的地下水水位,没有水流这会导致地面运动。所有的安装包括内衬勃起从表面完成。没有人员必须输入轴直到达到最终深度和充分保护。内衬包括在现浇混凝土预制要么段或铸造的。当衬里安装在表面上完成的,高质量的安装可以到达。在大多数情况下,二次衬砌不required.The第一VSM设备是超过15年前投产。如今,近80轴至85米的深度已经沉没全球使用VSM。本文将描述在隧道项目凿井了所有必要的安全和沿正在讨论VSM规划时,各方面的作用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号