首页> 外文期刊>Tunnel >Infotainment Elevator for Altena Castle - An unusual Tunnelling and Shaft Sinking Project
【24h】

Infotainment Elevator for Altena Castle - An unusual Tunnelling and Shaft Sinking Project

机译:阿尔特纳城堡的信息娱乐电梯-一个不寻常的隧道和下沉项目

获取原文
获取原文并翻译 | 示例
           

摘要

The town of Altena was committed to making the castle more easily accessible and thus even more attractive for visitors. As a result, a tunnel and shaft complex was set up, providing a direct link between Altena's pedestrian zone and the upper courtyard of the castle. An elevator was then subsequently built into the shaft. The tunnelling roughwork operations for this project were executed by the mining specialists Feldhaus Bergbau and Deilmann-Haniel and completed as scheduled in June 2013. In this way, the extremely tight construction period was adhered to. The town of Altena as client has expressed just how pleased it is with the manner in which work has progressed and its outcome.
机译:阿尔特纳(Altena)镇致力于使这座城堡更容易到达,从而对游客更具吸引力。结果,建立了一个隧道和竖井综合体,在阿尔特纳的步行区和城堡的上层庭院之间提供了直接的联系。随后将电梯安装到井道中。该项目的隧道掘进粗加工操作由采矿专家Feldhaus Bergbau和Deilmann-Haniel执行,并按计划于2013年6月完成。这样,坚持了极为紧张的施工期。作为客户的阿尔特纳镇已经表达了对工作进展及其成果的满意程度。

著录项

  • 来源
    《Tunnel》 |2013年第5期|24-34|共11页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号