首页> 外文会议>Rapid Excavation and Tunneling Conference >Engineered and Safe Approach to Tunnel Segment Lining Installation with Dowelled-ln Connectors on the First TBM Tunnel in Qatar
【24h】

Engineered and Safe Approach to Tunnel Segment Lining Installation with Dowelled-ln Connectors on the First TBM Tunnel in Qatar

机译:在卡塔尔第一个TBM隧道上用销钉连接器隧道段衬砌安装的工程和安全的方法

获取原文

摘要

Abu Hamour (Musaimeer) Surface & Ground Water Drainage Tunnel - Phase I (AHSO) is a 9.5k m long, 3.7 m ID storm water tunnel which was successfully and safely completed using circumferential dowelled-in connectors and guidance rods. The approach assured precise, safely sequenced and engineered radial segment fastening. The installation was designed with safety in mind. However, precision and quality assurance were the key requirements to assure that no newly or previously installed segments were not free standing during segment and ring installation process.
机译:阿布哈勃(穆斯曼德)表面和地面排水隧道 - I期(AHSO)是9.5km长,3.7米ID雨水隧道,使用圆周销钉连接器和引导杆成功和安全地完成。该方法确保精确,安全测序和工程化的径向段紧固。安装设计了牢记安全。然而,精确和质量保证是确保在段和环安装过程中没有自由站立的新或以前安装的细分的关键要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号