首页> 外文会议>International Conference on Public Policy, Social Computing and Development >The Coordination in the Implementation of the Uninhabitable Home Improvement Program in West Bandung Regency
【24h】

The Coordination in the Implementation of the Uninhabitable Home Improvement Program in West Bandung Regency

机译:西万通丽晶无人家庭改善计划的协调

获取原文

摘要

The background of this research is the acquisition of housing which is one of the basic human needs. Land availability for housing is increasingly limited as population growth is high. This condition has implications for the demand of better services from the government in order to provide housing for the community. The Regency Government of West Bandung solves the problem by making a program called the uninhabitable home improvement. The objective of this research is to describe the coordination in the implementation of uninhabitable home improvement program in West Bandung Regency. This research would analyze the six steps of coordination from Bose (2012). This research used the qualitative research method. The data collection technique was conducted through literature study, observation, and in-depth interviews. The validation technique of triangulation was used to verify data. The result of this research showed that first, there is no communication forum. Second, the monitoring of the activities of the uninhabitable home improvement has not been done to every home.
机译:该研究的背景是收购住房,这是基本人类需求之一。随着人口增长高,房屋的土地可用性越来越受限制。这种情况对来自政府的更好服务的需求有影响,以便为社区提供住房。 West Bandeng的丽晶政府通过制定一个涉及无人居住的家庭改善的计划来解决问题。本研究的目的是描述在西万通丽晶地区实施无人家庭改善方案的协调。该研究将分析来自Bose(2012)的六个协调步骤。本研究采用了定性研究方法。通过文献研究,观察和深入访谈进行数据收集技术。三角测量的验证技术用于验证数据。这项研究的结果表明,首先,没有通信论坛。其次,监测无人居住的家庭改善的活动尚未对每个家庭做的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号