首页> 外文会议>World Landslide Forum >A Case Study on the Treatment Project for the Shallow Landslide with Strip Loose Covering
【24h】

A Case Study on the Treatment Project for the Shallow Landslide with Strip Loose Covering

机译:浅层滑坡宽松覆盖物的治疗项目案例研究

获取原文
获取外文期刊封面目录资料

摘要

Landslide with strip loose covering, the method to deal with the landslide mainly included "slide-resistant pile,Gravity retaining wall, removed the material at the rear of the slide, backfill the material at the toe of the slide, vegetation protection and drainage engineering" etc [1].In the design of project management need to calculate stability and thrust[2], this paper according to the example of "Ping Zi mountain landslide treatment engineering construction design in Ningnan County, Sichuan Province", to study the measure to retaining the landslide that is classified into layered loose cover aliding.The surface of landslide, with shallow strip shape is an elongated, the characteristics including berm shaped, anterior elevation etc, retaining engineering not only satify the barrier down the sliding body requirements, but also to prevent the slope cutting out from the top of the landslide.According to the real terrain, it is necessary to adopt grading supporting measures and comprehensive control of drainage system.
机译:滑坡宽松覆盖物,处理滑坡的方法主要包括“滑动桩,重力挡土墙,取下载玻片后部的材料,将材料回填,在脚趾处回水,植被保护和排水工程“等[1]。在项目管理需要计算的稳定性和推力[2]的设计,根据的例子本文‘评字山体滑坡治理工程施工组织设计中宁南县,四川省’,研究措施以保持被分类为层状松盖滑坡aliding.The表面滑坡,浅条形状是细长的,所述特性包括护堤成形,前海拔等,保留工程不仅satify阻挡向下滑动体的要求,但另外,防止坡度从山体滑坡的顶部切割出来。根据真实的地形,有必要采用等级支持措施和补充沉重控制排水系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号